Beiträge und Aktuelles aus der Arbeit von RegioKontext

Oft ergeben sich in unserer Arbeit Einzelergebnisse, die auch über das jeweilige Projekt hinaus relevant und interessant sein können. Im Wohnungs- marktspiegel veröffentlichen wir daher ausgewählte eigene Analysen, Materialien und Texte. Gern dürfen Sie auf die Einzelbeiträge Bezug nehmen, wenn Sie Quelle und Link angeben.

Stichworte

Twitter

Folgen Sie @RegioKontext auf Twitter, um keine Artikel des Wohnungsmarkt- spiegels zu verpassen.

Über diesen Blog

Informationen über diesen Blog und seine Autoren erhalten sie hier.

sellafield contact number

10.05.2023

0845 055 1233 - Calls will cost 57 pence per minute from a landline. The lagoon stores surface water from the Separation Area and processes water from other facilities prior to controlled release via the discharge pipeline to sea. Since 1956, UK nuclear power has saved 2.3 billion tonnes of carbon emissions, the equivalent of all the UKs emissions from 2015 to 2020. Information for current suppliers is published on Sellafield Ltds Management of Contractors portal. You can change your cookie settings at any time. The Sellafield site is not open to the public. Sellafield Ltd has awarded four 20-year contracts which together form the new Programme and Project Partnership. Once the fire was extinguished the fire crew confirmed that there was no further risk, and a facility team then carried out a controlled shutdown of equipment in the building. During routine plant checks, an operator reported that domestic raw sewage within a settlement tank was overflowing and discharging via the sewage treatment works outlet. The document is useful for both existing and potential suppliers looking to further understand our supply chain landscape and to be used in conjunction with the prime supplier listing which explains what the main site contractors are looking for in their supply chain. Sellafield will change over the next 3 to 5 years. During this discharge, it was recognised that the environmental assessment and Discharge Approval did not include all dosing chemicals in the liquor, and the discharge was ceased. The first defect was discovered during a standard safety assessment of a steel ventilation duct wall connected to a material handling facility at Sellafield. Following the subsequent management investigation, the event was classified as an INES level 1 (anomaly). News stories, speeches, letters and notices, Reports, analysis and official statistics, Data, Freedom of Information releases and corporate reports. Research and experimental development on social sciences and humanities (72200), NACE Rev.2 (EU 2008) : An assessment confirmed that the radiation dose received was significantly less than the annual limit allowed for an individual. The findings from this investigation can be viewed here: Chemicals Disposal Investigation Report. There were no safety implications and minimal environmental impact. During a routine inspection of chemical substances stored on the Sellafield site, a small amount of chemicals were identified as requiring specialist disposal. We have engaged with our regulators. Institution of Mechanical Engineers (IMechE), Purchase a We also use cookies set by other sites to help us deliver content from their services. 206K views 3 years ago Lying on the remote north west coast of England is one of the most secret places in the country - Sellafield, the most controversial nuclear facility in Britain. pumps were stopped and additional samples taken. This covers approximately 6 to 8km from the centre of the Sellafield site. If you have a specific request, please use the Contact Us form. Sodium Hydroxide is a non radioactive chemical that is used to condition the effluent stream during this process. We are working with the operator of this facility to understand what, if any, consequences arose as a result of the handling of this waste. Following the subsequent investigation this event was reclassified as an INES level 1 (anomaly) shortfalls in the implementation of safety case changes and repetition of similar shortfalls relating to safety case compliance and oversight. This service is produced by Kompass. Environment, Safety and Security Director, Find out about the Energy Bills Support Scheme, Sellafield Ltd environmental and safety reports, Graphene testing, waste heat capture, and grown materials how Sellafield is pushing the boundaries of environmental protection, Environmental graduate Louise Moysan is shaping the future at Sellafield, Day in the life: How environmental specialist David Smith is shaping the future at Sellafield, Nuclear is green and the perfect career challenge for those passionate about the environment, Nuclear Decommissioning Authority: Business Plan 2023 to 2026, Cumbrian firm cements its future with 2.6 million Sellafield win, Sellafields skills recognised on national stage, Sellafield Ltd Procurement Plan Schedule - March 2023, Particles in the Environment Annual Report - Update Q1 to Q4 2021, Particles in the Environment Annual Report - Update Q4 2018, The economic contribution of the NDA to the West Cumbria economy, April 2022, NDA Draft Business Plan 2021 to 2024 for Consultation, NDA Mid-year performance report 2022 to 2023, See all transparency and freedom of information releases, Read about the Freedom of Information (FOI) Act and. Westlakes Science and Technology Park Sellafield Ltd has detected that the liquid levels in a concrete sump tank in the legacy ponds area of the Sellafield site have recently fallen. An empty transport flask, that was returning to Dounreay site in Scotland from Sellafield, was found to contain a small amount of metallic debris. There was no risk to our workforce or the community. There was no risk to site personnel or members of the public. The follow-up investigation identified a number of operational improvements. The data we collect is only what is necessary for the proper use of our service. Previously Sellafield was owned and operated by BNFL. From talented graduates to people skilled in Engineering, Science, Facilities, Safety or Project Management. Sellafield Ltd is a global centre for nuclear engineering management. When the filters were repacked, approximately 80 litres of water was found in the disposal bag. In doing so, they made a significant contribution to national low carbon power generation. It will take only 2 minutes to fill in. The soil in the area where the sampling took place is considered low risk and there are no safety or environmental consequences. There were no safety consequences. The Sellafield Ltd Supply Chain Strategy 2019/20 sets out how we will work with the supply chain to deliver the Sellafield mission. Daily suspended particle results in the water discharged from the Sewage Treatment Works were elevated on three occasions during August and September 2019. Dont worry we wont send you spam or share your email address with anyone. The SME Forum was established by Sellafield Ltd Supply Chain Development Team to facilitate consistent engagement and open communication with the SME community. (fog horn noise)If you hear the Sellafield Emergency Siren, go indoors, close doors andwindows and follow the instructions in . Two drains exterior to the building which discharge to a lagoon were subsequently sealed. COVID-19 information box has been deleted from the page. Dont include personal or financial information like your National Insurance number or credit card details. Sellafield Ltd works with the Nuclear Decommissioning Authority. Waste Management. The purpose of the document is to provide the supply chain with greater visibility of our key procurements by expanding on the procurement detail. Well send you a link to a feedback form. What are the Graduate team's contact details? If you live within the zone, you should have received a leaflet in the post from Cumbria County Council. We are building on the world-class solutions and successes we have already delivered to create a new agenda with four Focus Areas. Our hazard reduction experience at Sellafield also includes waste retrievals from the Magnox Swarf Storage Silo, one of the sites legacy facilities. Emergency information line. A second power dip occurred on the 21 January where an on-site grid transformer went offline due to a failed cable sealing end. An investigation is underway. Dont include personal or financial information like your National Insurance number or credit card details. Updated LINC registered companies and categories, As of the 16 January 2022, LINC with Sellafield will be transitioned to the NDA groups new eSourcing system, Atamis. It was identified due to the diligence of this auditing process that some metallic waste which potentially contained asbestos had been sent to a facility not permitted to handle asbestos. There were no safety or environmental consequences. Following an engineering review in early November 2022, the First Generation Magnox Storage Pond (FGMSP) fire detection system was deemed to be inadequate. Wed like to set additional cookies to understand how you use GOV.UK, remember your settings and improve government services. Now more than ever, we appreciate the hard work, sacrifice and dedication of the medical profession in ensuring the health and safety of our communities. The DSA framework, potentially worth up to 1.5 billion over the 15 years, will provide Sellafield with access to the full range of . A pioneer for the U.K.s nuclear industry, Sellafield supported national defense, generated electricity for nearly half a century and developed the ability to safely manage nuclear waste delivering great benefit, while also creating a complex nuclear cleanup challenge for which there arent any blueprints. During routine sampling and testing of small amounts of soil on the Sellafield site to ensure its suitability for reuse, the relevant project backfilled the excavated area prior to receiving confirmation that it was suitable for backfill. You have accepted additional cookies. How to find and apply for opportunities at Sellafield. One sample is sent to Sellafield Ltds laboratories for analysis, while the other is sent to the Environment Agency. A number of the individuals shift team were stood down on the day to ensure their health and welfare, and all non-emergency HV switching on site was suspended while an initial investigation was carried out. Sellafield site Sellafield Seascale Cumbria CA20 1PG. While transferring cement grout washing liquid to a settling tank on the Sellafield site, a small amount of liquid was leaking out of the drainage area and into the exterior surface water drain. It has been identified that the contents of a Sellafield Ltd septic tank, just outside the Sellafield site boundary, were collected and disposed through the foul sewer network on the main Sellafield site. A person was treated for contamination to the hand after removing a weed from a duct adjacent to a walkway within a radiation controlled area on the Sellafield site. Following the alarm the operator in the plant left the area and reported the issue to the operations team. Please note that the number we use for some sites is our Chadwick House number. It will take only 2 minutes to fill in. It includes future activity even if funding hasnt been secured. Change of contact details and additional information regarding the new LINC scheme. Birchwood Park AvenueWarringtonCheshireWA3 6GR, Ingwell Drive * Sellafield Ltd incident report - Elevated reading on filter change - 02 December 2021, Incident report - Elevated reading on filter change - 02 December 2021, New - Sellafield Ltd Incident Report Holes in ductwork, New incident report added - Small fire in building 22 October 2021, Sellafield Ltd incident report Leak 22 December 2020, Sellafield Ltd incident report Chlorine levels, Update report - Consignment of waste metals 11 February 2021, Sellafield Ltd incident report - Construction waste misconsignment 18 December 2020, List has been updated with two new incident reports, New incident report added - Soil sampling process, New incident report added - Misrouting of waste metal 9 July 2018. Moor RowCumbriaCA24 3HW. Engineering design has been transformed by challenging accepted ways of doing things, removing unnecessary scope, making procurement smarter, and reducing costs with radical new technologies and lean techniques. A management investigation was also undertaken focusing on the robustness, usability and adherence of relevant procedures, training and supervision. Find out about the Energy Bills Support Scheme.

Jackson County, Iowa Warrant List, Montana Class A Divisional Basketball Tournament 2022, Disadvantages Of Cyclic Menu, San Mateo County Mask Mandate End Date, Natura Bisse Detox Body Balm, Articles S

Stichwort(e): Alle Artikel

Alle Rechte liegen bei RegioKontext GmbH